SIL verification

SIL verification

For every single SIL 1/2/3 or 4 safeguard, the following actions are performed in accordance with IEC 61511 or IEC 61508;

  • Identification of safeguard. It is wise to make a schematic drawing with all the relevant sensors, components and final elements.
  • Verifying the functionality of the safeguard.
  • Determine whether the safeguard is separated from the system.
  • Check against the architectural requirements (eg is one valve sufficient?).
  • Check to the probabilistic requirements (calculation of probability of failure on demand).
  • Check for systematic faults.

It is highly recommended to make taylor-made test procedures during design phase.

Also for HIPPS systems (High-integrity pressure protection system) it is necessary to perform a SIL verification.